Investor Webinar – Investment, Offtake and Strategic Partnership of Volkswagen Group and PowerCo By Investing.com



VANCOUVER, BC, December 18, 2024 /PRNewswire/ – December 18, 2024Sydney, Australia

Patriot Battery Metals (TSX:) Inc. (the “Company” or “Patriot”) (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (FSE: R9GA) glad to advise that Ken Brinsdenthe President, CEO and Managing Director of the Company, will host a live investor webinar today, December 18, 2024after announcing an equity investment, off-take and strategic partnership with Volkswagen (ETR:) Group and PowerCo.

Mr Brinsden discuss the strategic rationale and implications of the transaction for Patriot and its strategy to develop the Shakichiwanan Lithium Project on Quebec, Canada.

There will be an opportunity for investors, analysts and shareholders to submit questions through the Q&A tab within the webinar portal after the completion of the Mr Brinsdenthe presentation. On the other hand, Questions can be submitted in advance via email to the Company’s Investor Relations Manager, Mr Olivier Caza-Lapointeat [email protected].

Registration Details

North American Time Zone “Beginning with at 8:00 in the morning Canadian Eastern Standard Time and will last approximately 45 minutes. Investors, shareholders and media can register to attend the webinar through the following link:

https://www.bigmarker.com/read-corporate/Patriot-Battery-Metals

A recording of the webinar will be released via Patriot’s website and social media platforms for the benefit of investors who cannot attend the live webinar.

About Patriot Battery Metals Inc.

Patriot Battery Metals Inc. is a hard-rock lithium exploration company focused on the development of its district-scale 100% owned Shaakichiuwaanan Property (formerly known as Corvette) located in Eeyou Itchee James Bay region of Quebec, Canadawhich is accessible throughout the year via an all-season road and close to regional power line infrastructure. The Shaakichiuwanan Mineral Resource(1)which includes CV5 & CV13 spodumene pegmatites, total 80.1 Mt at 1.44% Li2Or Shown, and 62.5 Mt at 1.31% Li2Or Inferred, and ranks as the largest source of lithium pegmatite in Americaand 8th largest lithium pegmatite resource in the world. In addition, the Shaakichiuwaanaan Property hosts several other spodumene pegmatite clusters that remain to be drill tested, as well as key future trend areas that remain to be explored.

For more information, please contact us at [email protected] or by calling +1 (604) 279-8709, or visiting www.patriotbatterymetals.com. Please also see the Company’s continuous disclosure filing, which is available under its profile at www.sedarplus.ca and www.asx.com.aufor available exploration data.

Competent Person Statement (ASX Listing Rule 5.23)

The mineral resource estimate in this release is reported by the Company in accordance with ASX Listing Rule 5.8 of August 5, 2024. The Company confirms that, as of the date of this notice, it is not aware of any new information or data verified by a competent person that materially affects the information included in the notice and that all material assumptions and technical parameters that support the estimates of the announcement continue to apply and have not changed materially. The Company confirms that, as of the date of this announcement, the form and context in which the findings of the competent person are presented have not been materially changed from the original market announcement.

This news release has been approved by the Board of Directors.
“KEN BRINSDEN”
Kenneth BrinsdenPresident, CEO, and Managing Director.

__________

1

The Company “NI 43-101 Technical Report Preliminary Economic Assessment for the Shaakichiuwaanan Project” dated August 21, 2024 prepared by Todd McCracken, P. Geo., Hugo Latulippe, P.Eng., Shane Ghouralal, P.Eng., MBA, Luciano Piciacchia, P.Eng., Ph.D, Ryan Cunningham, M.Eng., P.Eng. and Nathalie Fortin, P.Eng., M.Env., available on SEDAR+. Mineral Resource Estimate (80.1 Mt at 1.44% Li) for Shakichuana (CV5 & CV13).2O and 163 ppm Ta2or5 Shown, and 62.5 Mt at 1.31% Li2O and 147 ppm Ta2or5 ppm Inferred) is reported at a cut-off grade of 0.40% Li2O (open pit), 0.60% Li2O (underground CV5), and 0.80% Li2OR (underground CV13) with an Effective Date of June 27, 2024 (through drill hole CV24-526). Mineral Resources are not Mineral Reserves because they have no demonstrated economic life.





Source link

  • Related Posts

    DOGE mad at ‘third rails’ of america politics – errors can delay or interfere benefits, a former old social security security

    In history, singing social security benefits have been seen as a political “third rail,” which means that anyone can touch it to reach. The White House said to a Press…

    Porsche Se says it does not consider sales of Volkswagen parts

    Porsche Se says it does not consider sales of Volkswagen parts Source link

    Leave a Reply

    Your email address will not be published. Required fields are marked *